Frequently Asked Questions

Honestly, there’s no single number we can give you without seeing the house. Swapping out a vanity and some tile in a hall bath costs a fraction of a full kitchen gut, especially if you want the sink on a different wall. We’ll come take a look, then put a real price in writing for you.
Hard to say until we know what’s being done. A bathroom that keeps its layout and just gets new tile moves pretty quickly. Kitchens take longer. And when something drags, it’s usually backordered cabinets or a custom vanity, not the construction itself.
A few months is a good cushion. Design and county permits both take time, and you don’t want to be picking tile the same week demo is supposed to start.
Set some money aside that you’re not planning to spend. Older homes hide things, and nobody can price a rotted subfloor under a toilet until that floor comes up. Choosing finishes early helps too, because that’s where budgets tend to creep.
Only if the scope changes or we uncover a hidden problem, like water damage. You’ll approve any extra work in writing before we do it.
Depends on the budget. Doing it all at once tends to cost less overall, but plenty of families would rather not live in a construction zone for months, and that’s fair.
Pretty much the whole job on our end. That means design help and permits, demo, the build, the finish work, and hauling the mess away when we’re done.
Not usually. A kitchen job means a few weeks of takeout and a microwave in the dining room, but you can live with that. Bigger projects are a different story, and we’ll talk it through with you.
We do that. Plenty of clients just want someone to sit down with them and talk through layouts. Already working with a designer? That’s fine with us too.
Honestly? Everything you can. Jobs that stall are almost always waiting on one faucet or a light fixture nobody’s picked yet.
Think about who uses the room and how often before you fall for any particular finish. Then we’ll price a couple of options for you. Some upgrades look small on paper and end up costing more than you’d guess, and sometimes it’s the other way around.
We can, but it isn’t free. A sink needs new drain and water lines, and a gas range needs gas run to the new spot. You’ll know what it adds before we start.
Absolutely. The tile’s the easy part. Where we slow down is the waterproofing underneath and getting the floor sloped right toward the drain, because a shower that’s off by a little can leak for years before anyone notices.
Our advice? If the layout works, leave it alone. The money you’d spend moving walls and pipes goes a long way on nicer cabinets. If it really doesn’t work, though, we’d rather fix that than put pretty doors on a bad plan.
Probably, yes. We’ll want to find out where the water’s getting in first, though, since finishing over a moisture problem just hides it until the drywall starts to smell.
We do, even if you’re not planning to finish the basement right away.
Not always. It depends on the size of the addition and your situation, so it’s worth getting a price before you decide.
Longer than most people think, mainly because of design work and county permits. We’ll give you a realistic schedule after we’ve seen the property.
Yes, along with screened-in porches.
Most work beyond cosmetic updates needs one. Structural, electrical, plumbing and mechanical changes generally require a permit from Loudoun County, while paint or new flooring usually doesn’t. We take care of the permits on our projects.
Probably. Additions and decks almost always need it, and some boards meet just once a month.
Check their Virginia contractor license. It takes about two minutes on the DPOR website, and a surprising number of people skip it.
Recent work you can look at, a quote in writing, and whether they answered your first phone call or made you chase them.
That’s the plan. You’ll have one main contact from the start of the project to the end.