Full House Remodeling
When you want to update most or all of the house at once, we plan and manage the whole project. Our full house remodeling in Sterling VA brings kitchens, bathrooms, flooring and layout changes together under one plan and one schedule. You’ll have a single point of contact from the first design meeting to the final walkthrough.
Detailed Full House Remodeling in Sterling VA
The electrical panel seems like an odd place to start a conversation about a new kitchen and living room, but that’s often where we begin. Once you add new appliances, recessed lights in every room and maybe a heated bathroom floor, an older panel can run out of capacity fast. With full house remodeling in Sterling VA, we look at the panel and the HVAC early, because the walls are only going to be open once. Not exciting, we know. We’ll tell you which upgrades really can’t wait and which ones can.
Taking down the wall between the kitchen and the living room is one of the requests we hear most on a whole house remodeling job in Sterling VA. Sometimes it’s an easy wall. Other times it’s holding up part of the second floor, and then it needs an engineer and a beam, which adds some cost and a bit of time. We can usually tell which kind you’ve got after a look in the attic or the basement. Flooring is the other piece people underestimate, since running one floor through the whole main level looks great but means every room has to be cleared out at the same time.
Modern Whole House Design and Remodeling in Sterling VA
Can you stay in the house while we work? Usually yes, at least for most of it. We split the job into sections and put up plastic walls with zipper doors to keep the dust where we’re working, but there’s normally a stretch, like when the kitchen’s out or the floors are going down, when a relative’s place starts looking pretty good. With modern whole house design and remodeling in Sterling VA, we also try to get all the finishes picked at once. That means hardware, trim, paint colors and light fixtures too, so you don’t end up with a 2012 bathroom right next to a brand-new kitchen.
Electrical Capacity
Older panels weren’t built for today’s kitchens, and we’d rather find that out early, not mid-job.
Same Flooring Everywhere
One continuous floor on the main level. It looks bigger and skips the awkward transition strips.
Walls That Carry Weight
Want that wall gone? If it’s load-bearing, an engineer sizes the beam before anyone starts.
Dust Control
Plastic walls with zipper doors go up around each work area, and the finished floors get covered.
Frequently Asked Questions
People usually show up to the first meeting with a list, which we like. Below are the questions about whole home renovation in Sterling VA that show up on those lists the most. Some answers really do depend on your house, and where that’s the case, we’ve said so.
There’s no honest ballpark without a walkthrough. Moving walls or redoing every bathroom adds up quickly, and you’ll get a written, itemized estimate once we’ve seen the house.
Scope is the biggest factor, along with whether you’re living there while we work. You’ll see a schedule before anything starts.
Anything inside the house you want changed, really. That covers layout changes, kitchens and baths, flooring, electrical and plumbing upgrades, and trim and paint, along with permits and inspections.
Look for someone who’s done whole-house jobs before, not just single rooms. Keeping that many trades coordinated is its own skill.